House Upgrade 2008 Part IV: a roof over our heads
The deck construction is almost finished. Almost… a slippery word, that can often mean “never”. Since the last posting on this topic, here is what has been completed:
- roof framing assembly (structural steel trusses) constructed
- aluminum framing and acrylite / polycarbonate roofing panels installed
- electrical roughed in
- exposed steel clad in cedar
- deck stairs constructed
- second “quick connect” natural gas fitting installed
It looks pretty good, actually, and is “done enough” that the things remaining feel rather minor. The roof has turned out really nicely: Solariumsplus did the work, and I’m really pleased with what Pete, Curtis and Randy put together for us. Some pictures…